is delighted to welcome its new colleagues from Green Frog Connect and AMS Tren…

Hanab

is delighted to welcome its new colleagues from Green Frog Connect and AMS Trenchless.

Working at
Hanab vlog #8

New vlog: WKO ONE-installation by Dubotechniek

From design to installation: WKO ONE-installation by Dubotechniek A WKO ONE-installation by Dubotechniek, part of Hanab, has been installed in Utrecht (The Netherlands). The system was prepared in Dubotechniek's workshop in Zaltbommel, where it was fully prefabricated and tested. It was then transported to the construction site in sections and installed within a short timeframe. A WKO system (Aquifer Thermal Energy Storage – ATES) uses energy stored in the ground to heat and cool buildings. This provides a sustainable and energy-efficient solution. By assembling and testing the system before transport, on-site work is kept to a minimum and quality can be carefully controlled throughout the process. In this vlog, you'll see how the design, construction and installation process comes together in practice.